Contact Info

Unit 11 & Unit 56 Plc System Modernization Project

  • Client: MIDOR
  • Category: Oil and Gas
  • Application : Jet Pump, Sulfer Crusher and Handling System
  • Project No: 1252

Unit 11 & Unit 56 Plc System Modernization Project

• Design, installation and commissioning of PLC- Based control & HMI Systems for units 11 & 56.

MIDOR Sulfur Handling & Jet Water Pump Automation Upgrade

To ensure safe and reliable operations, a major oil & gas client entrusted MISC to modernize obsolete automation systems for critical utility and material handling units. The project replaced legacy Siemens S5 controllers with advanced Siemens S7-400H technology.

Project Scope

  • Unit 56 – Sulfur Handling & Crusher System; Migration from Siemens S5 to S7-400H redundant PLC, Integration of advanced monitoring and control functions
  • Unit 11 – Jet Water Pump; Upgrade from Siemens S5 to S7-400H PLC, Enhanced operator interface and system diagnostics

Key Benefits

  • Improved reliability and availability with redundant S7-400H systems
  • Future-ready control platform replacing obsolete Siemens S5
  • Enhanced operational safety for sulfur handling and pumping processes
  • Better monitoring & diagnostics, ensuring smoother plant operation

Outcome

The upgrade delivered robust, secure, and modern control systems for both Sulfur Handling and Jet Water Pump units, ensuring continuous safe operation, reduced downtime, and simplified maintenance through Siemens’ latest automation technology.

Technology used:

S7-400H